The short version
- Loan Estimate (LE): delivered or mailed within 3 business days after application, and at least 7 business days before consummation.
- Closing Disclosure (CD): the borrower must receive it at least 3 business days before consummation.
- A new 3-business-day wait is required only if the APR becomes inaccurate, the loan product changes, or a prepayment penalty is added.
- No fees before the borrower receives the LE and says they intend to proceed, except a reasonable credit report fee.
What TRID is
The TILA-RESPA Integrated Disclosure rule (TRID), nicknamed “Know Before You Owe,” took effect in October 2015. Dodd-Frank told the CFPB to merge the overlapping TILA and RESPA forms. TRID replaced four forms with two:
| Old forms | New form |
|---|---|
| Good Faith Estimate (RESPA) + early Truth-in-Lending disclosure (TILA) | Loan Estimate |
| HUD-1 Settlement Statement (RESPA) + final Truth-in-Lending disclosure (TILA) | Closing Disclosure |
Purpose: give borrowers easier-to-use disclosures early (to shop and compare) and before closing (to spot changes), with limits on how much costs can rise.
Which loans are covered
TRID covers most closed-end consumer credit secured by real property (or a cooperative unit): purchase loans, refinances, construction loans, loans on vacant land, and closed-end home equity loans.
Not covered:
- Home equity lines of credit (HELOCs) (open-end credit)
- Reverse mortgages
- Loans secured by a mobile home or dwelling not attached to real property (personal property)
- Loans not covered by Reg Z at all (business purpose, etc.)
- Certain no-interest, down-payment-assistance-type loans that meet a partial exemption (they get other disclosures)
Two kinds of “business day”
| Definition | Meaning | Used for |
|---|---|---|
| General | A day the creditor’s offices are open to the public for substantially all business functions | Delivering the initial LE within 3 business days of application; the written list of providers; the Home Loan Toolkit |
| Specific | All calendar days except Sundays and legal public holidays | The 7-day wait after the LE; the “mailbox rule”; revised LE received 4 days before closing; the CD’s 3-day wait; rescission |
Mailbox rule: if a disclosure isn’t handed over in person, the consumer is considered to receive it 3 business days (specific definition) after it’s delivered or placed in the mail. Email works the same way unless the lender has proof of earlier receipt.
The Loan Estimate
Timing
- Delivered or placed in the mail no later than the 3rd business day after the creditor receives the application.
- Delivered or placed in the mail no later than the 7th business day before consummation. (So the loan can’t close until at least 7 business days after the LE goes out.)
An application exists once the lender has the six items: name, income, SSN (to pull credit), property address, estimated property value, and loan amount sought.
Who provides it
The creditor is responsible. A mortgage broker may provide the LE instead after receiving the application, but the creditor is still responsible for making sure it’s right.
What’s on it
Three pages: loan terms (amount, rate, monthly principal and interest, whether any of these can increase, prepayment penalty, balloon payment), projected payments (including estimated taxes and insurance), estimated closing costs and cash to close, a breakdown of loan costs and other costs, and comparisons (such as the APR, the total interest percentage, and what you’ll pay in 5 years). The LE also lists the services the borrower can shop for.
Written list of settlement service providers
If the borrower is allowed to shop for a service (like title or pest inspection), the creditor must give a separate written list with at least one available provider for each shoppable service, stating that the borrower may choose a different provider. It’s due on the same schedule as the LE (within 3 business days of application).
Rules before the LE
- Fees: no one may charge the borrower any fee (application, appraisal, underwriting) until the borrower has received the LE and indicated an intent to proceed. The only exception is a bona fide and reasonable credit report fee.
- Intent to proceed: the borrower can show it in any manner they choose (spoken, email, signed form) unless the creditor requires a particular method. The creditor must document it.
- No verification documents required: the creditor can’t require the borrower to submit documents (like pay stubs or bank statements) before issuing the LE. The LE is based on what the borrower tells you.
- Pre-LE written estimates: any written, consumer-specific estimate given before the LE must say at the top of the first page, in at least 12-point font: “Your actual rate, payment, and costs could be higher. Get an official Loan Estimate before choosing a loan.” It can’t look like an LE.
Incomplete information
The LE must be given in good faith using the best information reasonably available at the time. An MLO can’t hold back the LE because some details are missing (once the six items are in hand, the 3-day clock is running). If something later changes, the creditor may be able to issue a revised LE (chapter 7).
LE expiration
If the borrower doesn’t indicate intent to proceed within 10 business days after the LE is provided (or any longer period the creditor allows), the creditor is no longer bound by the estimates and may issue a revised LE.
The Closing Disclosure
Timing
The consumer must receive the CD no later than 3 business days before consummation (specific business day definition). If it’s mailed, the mailbox rule applies, so it must go out 6 business days before closing (3 days for mail + 3 days waiting).
The creditor is responsible, but a settlement agent may prepare and deliver it.
What’s on it
Five pages showing the actual loan terms and costs: loan terms, projected payments, closing cost details, cash to close, a summary of the transaction, loan disclosures (like escrow account information), and loan calculations (total of payments, finance charge, amount financed, APR, total interest percentage).
Consumer’s right to inspect
On request, the borrower can inspect the CD (with whatever is known) during the business day before consummation.
Changes before closing
Most changes (like a lower closing cost or a small fee change) just require a corrected CD given at or before consummation. No new wait.
A new 3-business-day waiting period is required only if:
- The APR becomes inaccurate (increases beyond the tolerance: more than 1/8 of 1% for a regular loan, or 1/4 of 1% for an irregular loan). A decrease in APR generally doesn’t require a new wait if it results from a decreased finance charge.
- The loan product changes (for example, fixed rate to adjustable rate).
- A prepayment penalty is added.
Changes after closing
- Event during the 30 days after consummation that changes an amount the borrower paid: corrected CD within 30 days of learning of it.
- Non-numeric clerical errors: corrected CD within 60 days after consummation.
- Tolerance refunds: refund and corrected CD within 60 days after consummation (see chapter 7).
Waiving the waiting periods
A borrower facing a bona fide personal financial emergency (like an imminent foreclosure sale) can waive or shorten the 7-day LE wait or the 3-day CD wait with a dated written statement describing the emergency, signed by all consumers. Pre-printed waiver forms are not allowed.
Record retention
| Record | How long |
|---|---|
| Evidence of LE/CD compliance | 3 years after consummation |
| The Closing Disclosure itself (and related documents) | 5 years after consummation |
Numbers to memorize
| Item | Number |
|---|---|
| TRID effective | October 2015 |
| LE deadline after application | 3 business days (general) |
| LE before consummation | At least 7 business days (specific) |
| Mailbox rule | Received 3 business days after mailing |
| Borrower must indicate intent to proceed within | 10 business days (or LE may be revised) |
| Only fee allowed before LE + intent | Credit report fee |
| Pre-LE estimate warning font | At least 12-point |
| CD received before consummation | At least 3 business days (specific) |
| Mail the CD by | 6 business days before closing (3 mail + 3 wait) |
| APR accuracy (new wait if exceeded) | 1/8 of 1% regular; 1/4 of 1% irregular |
| New wait triggers | 3 (APR, product, prepayment penalty) |
| Post-consummation event correction | Within 30 days |
| Clerical error correction | Within 60 days |
| Keep LE compliance records | 3 years |
| Keep the CD | 5 years |
Memory tricks
- “3-7-3”: LE within 3 days of application, at least 7 days before closing; CD 3 days before closing.
- New waiting period = “APR” on its own: APR goes up, Prepayment penalty added, Replaced product. Everything else just gets a corrected CD at closing.
- “No fee before LE, except for credit, you see.”
- “LE gets 3 (retain), CD gets 5 (retain).”
Watch out on the exam
- The LE deadline is “delivered or placed in the mail” within 3 business days. The CD deadline is received 3 business days before closing.
- Saturdays count for the CD waiting period (specific business day definition). Sundays and federal holidays don’t.
- A change in closing costs alone (even a big one) does not restart the 3-day CD wait. Only APR, product, and prepayment penalty changes do.
- Collecting an appraisal fee before the borrower receives the LE and indicates intent to proceed is a violation. Only the credit report fee is allowed.
- HELOCs and reverse mortgages don’t get LEs or CDs.
- The borrower can indicate intent to proceed verbally; silence doesn’t count.